Integration/Telecoms Project Manager - Data Centre Construction

Project Management
Dublin, Dublin IE
Permanent Full-Time
On-site
JobID 3822
Follow us on

The opportunity

As an Integration / Telecoms Project Manager at Linesight, you will work with highly experienced, culturally diverse, and passionate teams nurturing a strong social dynamic and a shared sense of achievement. You will gain vast industry experience that will open doors for you, extend your skillset and expand your perspective. We will empower, support, and enable you to take real responsibility in your role so that you can take charge of your career progression with us. For us lasting trusted relationships are everything, both with our teams and our clients.  


In this role you will:

  • Lead the integration of all telecoms, network and low-voltage technical infrastructure into the construction phase of a datacentre, ensuring seamless coordination with civil, structural and MEP works.

  • Oversee the planning and delivery of key integration packages, including pathways, containment, cabling, BMS interfaces and associated building fabric requirements.

  • Consolidate and validate all project close-out documentation, ensuring compliance with client expectations and obtaining full approval for handover.

  • Partner closely with design consultants, general contractors and specialist subcontractors to review feasibility, buildability and integration impacts across the construction lifecycle.

  • Support and drive the commissioning and handover plan, ensuring all documentation, testing evidence and certifications are delivered accurately and on time.

  • Identify and manage scope, programme dependencies and critical sequencing across multiple trades to achieve a fully coordinated datacentre environment.

  • Ensure contractors establish, implement and continuously monitor best-in-class safety practices and site procedures.

  • Work collaboratively with internal stakeholders and external delivery partners to ensure capacity, infrastructure readiness and integration milestones are achieved to budget and to programme.


We would love to hear from you if you:

  • Bring a degree or equivalent experience in construction project management, engineering or a related technical field.

  • Have demonstrable experience delivering integration or technical infrastructure projects within datacentres, large-scale commercial builds or highly serviced environments.

  • Understand the interfaces between telecoms, networks, BMS, MEP systems and the built environment, and can translate technical requirements into construction deliverables.

  • Enjoy working in a fast-paced environment where you can drive your own priorities while navigating complex stakeholder landscapes.

  • Build strong relationships through clear communication, shared objectives and a collaborative, positive approach.

About us

Since 1974, we’ve been providing a construction consultancy service that keeps clients coming back. And for that we have our people to thank. It takes a special kind of togetherness to create our thriving, authentic culture. We overcome challenges together, delivering better projects and leveraging innovation. We see the potential in our people and we empower them. We’re a business on a journey – an agile business that is proud to be different. We are Linesight. Dynamic. Driven. Different.

Our approach to DE&I

At Linesight, we believe that our success is tied to the success of our employees, and we are committed to creating a workplace that is fair, equitable, and inclusive for everyone. We understand that creating an environment where all employees have an equal opportunity to thrive requires a concerted effort across every stage of their time with us, from hiring and onboarding to promotion, career growth, and development.

As part of this commitment, we have implemented a range of policies and initiatives to promote diversity, equity, and inclusion (DE&I). This starts with our attraction pipeline and accessible job descriptions, designed to attract a broad range of candidates, and continuing throughout the employee life cycle with DE&I checks built in at every stage. Fairness, consistency, and transparency are the core principles for all our hiring, salary increase, and promotion decisions with built-in gender pay gap checks. Employee and family-friendly policies also enhance inclusion and equity in our teams.  

About Project Management

Our teams of program and project managers deliver success globally through strategic planning and stringent controls. Whether you have extensive experience or are at the early stages of your career in program or project management, we offer the opportunity to work on some of the most innovative buildings and facilities with world-leading clients. Play a central role in these projects as part of our dynamic team. We recognise the value that each team member can bring to the table, and we offer a range of supports, learning pathways and structured career planning cycles to ensure that every individual has the best opportunity to excel and further develop, regardless of the stage of your career you join us at.

Life at Linesight

Project Manager video still

Join our Talent Network