Document Controller / Project Coordinator (Data Centre Construction)

Project Management
Singapore SG
Permanent Full-Time
Hybrid
JobID 6675
Follow us on

The opportunity

As a Document Controller at Linesight, you will work with highly experienced, culturally diverse, and passionate teams nurturing a strong social dynamic and a shared sense of achievement. You will gain vast industry experience that will open doors for you, extend your skillset and expand your perspective. We will empower, support, and enable you to take real responsibility in your role so that you can take charge of your career progression with us. For us lasting trusted relationships are everything, both with our teams and our clients.  


In this role you will:  

  • Assist in creating reports and technical documents 
  • Enter accurate meta-data to electronic records to facilitate easy search and retrieval 
  • Implement trackers to monitor close out of proprietor actions 
  • Manage and control information circulation 
  • Set up an efficient document management system 
  • Support the quality & document control team to meet objectives 
  • Update, maintain, archive and retrieve procedures, registers, trackers and databases 

We would love to hear from you if you: 

  • Have experience in a similar document management role 
  • Have experience in Aconex and Sharepoint which are critical for this role 
  • Enjoy managing a large range of information 
  • Have excellent Excel and Powerpoint skills 
  • Are an excellent communicator verbally and in writing 
  • Thrive on building strong relationships with your team and clients through a shared purpose and sense of openness and fun 

All interviews are conducted either in person or virtually with video required.

About us

Since 1974, we’ve been providing a construction consultancy service that keeps clients coming back. And for that we have our people to thank. It takes a special kind of togetherness to create our thriving, authentic culture. We overcome challenges together, delivering better projects and leveraging innovation. We see the potential in our people and we empower them. We’re a business on a journey – an agile business that is proud to be different. We are Linesight. Dynamic. Driven. Different.

Our approach to DE&I

At Linesight, we believe that our success is tied to the success of our employees, and we are committed to creating a workplace that is fair, equitable, and inclusive for everyone. We understand that creating an environment where all employees have an equal opportunity to thrive requires a concerted effort across every stage of their time with us, from hiring and onboarding to promotion, career growth, and development.

As part of this commitment, we have implemented a range of policies and initiatives to promote diversity, equity, and inclusion (DE&I). This starts with our attraction pipeline and accessible job descriptions, designed to attract a broad range of candidates, and continuing throughout the employee life cycle with DE&I checks built in at every stage. Fairness, consistency, and transparency are the core principles for all our hiring, salary increase, and promotion decisions with built-in gender pay gap checks. Employee and family-friendly policies also enhance inclusion and equity in our teams.  

About Project Management

Our teams of program and project managers deliver success globally through strategic planning and stringent controls. Whether you have extensive experience or are at the early stages of your career in program or project management, we offer the opportunity to work on some of the most innovative buildings and facilities with world-leading clients. Play a central role in these projects as part of our dynamic team. We recognise the value that each team member can bring to the table, and we offer a range of supports, learning pathways and structured career planning cycles to ensure that every individual has the best opportunity to excel and further develop, regardless of the stage of your career you join us at.

Life at Linesight

Project Manager video still

Join our Talent Network