Energy Marshall/SAP - Data Centre Construction (m/f/d)

Project Management
Raunheim DE
Permanent Full-Time
On-site
JobID 5480
Follow us on

The opportunity

As a Senior Electrical Appointed Person / Energy Marshall at Linesight, you will work with highly experienced, culturally diverse, and passionate teams nurturing a strong social dynamic and a shared sense of achievement. You will gain vast industry experience that will open doors for you, extend your skillset and expand your perspective. We will empower, support, and enable you to take real responsibility in your role so that you can take charge of your career progression with us. You will be mentored and supported by industry leaders and given the tools to grow. You will also be involved in and contribute to our business strategy as we continue to evolve. For us lasting trusted relationships are everything, both with our teams and our clients. 


In this role you will: 

  • Be a visible leader on site, responsible for oversight of all related Power and Energization activities
  • Partner closely with Environmental, Health, and Safety teams to drive Operational Excellence in the Control of Hazardous Energy 
  • Review safety documentation and conduct audits to ensure safe conditions and practices throughout the energy program 
  • Support electrical infrastructure management throughout the data center campus 
  • Train new and existing employees in defined Energy Isolation process and procedure 
  • Work with construction and commissioning teams to ensure safe working conditions to properly test and validate installation, operation, and performance of MEP systems 

We would love to hear from you if you: 

  • Hold a Master’s or Bachelor’s degree in Electrical Engineering, Construction Management, or an equivalent engineering science discipline.

  • Have demonstrated experience in construction management of large, complex projects involving substantial MEP (mechanical, electrical, plumbing) systems—ideally within the hyperscale data center or other critical infrastructure projects.

  • Have experience in MV switching, construction and commissioning standards and practices, including life-saving system engineering principles.

  • Have extensive experience as a Senior Authorized Person managing electrical distribution and switching activities.

  • Understand electrical engineering principles, including breaker coordination studies, switchgear sequence of operations, and local electrical codes.

  • Are familiar with CSA and mechanical engineering principles related to cooling systems, including relevant statutory compliance.

  • Bring strong experience in general contractor and vendor management, including RFPs, bidding processes, and change orders during construction and execution phases.

  • Have worked on international projects and demonstrate a strong awareness of cultural, diversity, and inclusivity considerations in large-scale program delivery.

All interviews are conducted either in person or virtually with video required.

About us

Since 1974, we’ve been providing a construction consultancy service that keeps clients coming back. And for that we have our people to thank. It takes a special kind of togetherness to create our thriving, authentic culture. We overcome challenges together, delivering better projects and leveraging innovation. We see the potential in our people and we empower them. We’re a business on a journey – an agile business that is proud to be different. We are Linesight. Dynamic. Driven. Different.

Our approach to DE&I

At Linesight, we believe that our success is tied to the success of our employees, and we are committed to creating a workplace that is fair, equitable, and inclusive for everyone. We understand that creating an environment where all employees have an equal opportunity to thrive requires a concerted effort across every stage of their time with us, from hiring and onboarding to promotion, career growth, and development.

As part of this commitment, we have implemented a range of policies and initiatives to promote diversity, equity, and inclusion (DE&I). This starts with our attraction pipeline and accessible job descriptions, designed to attract a broad range of candidates, and continuing throughout the employee life cycle with DE&I checks built in at every stage. Fairness, consistency, and transparency are the core principles for all our hiring, salary increase, and promotion decisions with built-in gender pay gap checks. Employee and family-friendly policies also enhance inclusion and equity in our teams.  

About Project Management

Our teams of program and project managers deliver success globally through strategic planning and stringent controls. Whether you have extensive experience or are at the early stages of your career in program or project management, we offer the opportunity to work on some of the most innovative buildings and facilities with world-leading clients. Play a central role in these projects as part of our dynamic team. We recognise the value that each team member can bring to the table, and we offer a range of supports, learning pathways and structured career planning cycles to ensure that every individual has the best opportunity to excel and further develop, regardless of the stage of your career you join us at.

Life at Linesight

Project Manager video still

Join our Talent Network