17th October 2023
This premium development includes 393 units over 2 blocks of up to 7 floor levels and includes reception area, cafe, gym, multimedia room, roof top terraces and other communal areas. The development is centred around two courtyards with supporting communal facilities, basement car-parking as well as 24-hour concierge services.
The project involved complex interfaces with a number of infrastructure and utility providers, not least the construction of part of the BTR development over an existing Irish Water pumping station, and works adjacent to the LUAS Line.
Data
39,315 sq.m
Complete
Paul Brady
Director
Europe