Commercial Lead - Data Centre Construction

Cost Management/Quantity Surveying
Kajaani FI
Permanent Full-Time
On-site
JobID 5690
Follow us on

The opportunity

As a Commercial Lead at Linesight, you will work with highly experienced, culturally diverse, and passionate teams nurturing a strong social dynamic and a shared sense of achievement. You will gain vast industry experience that will open doors for you, extend your skillset and expand your perspective. We will empower, support, and enable you to take real responsibility in your role so that you can take charge of your career progression with us. For us lasting trusted relationships are everything, both with our teams and our clients


In this role you will:

  • Act as the key account manager, developing client relationships based upon partnership and trust.
  • Use your business development skills to engage new clients as well as repeat projects with existing clients.
  • Oversee key strategic client projects.
  • Create estimates and cost plans for key client developments.
  • Express high proficiency in Cost X & databooks.
  • Have experience managing large teams.
  • Actively lead in the preparation of QTO for Cost Plans / BoQs.
  • Actively prepare a QAQC Plan / Manual and implement the same for the quality assurance for the project.
  • Express high proficiency in MEP packages and moderate knowledge of MEPF works.
  • Express basic knowledge of Procurement of global projects.
  • Handle multiple projects and stakeholders from various time zones.
  • Actively help support Sales and Marketing.
  • Participate in drafting proposals to Clients.
  • Contribute to developing good client relationships that supports the business.
  • Impart training to the Leaders & other team members.
  • Foster top performance and growth for your employees via excellent mentorship and leadership
  • Lead your team to deliver impeccable quality and client value.

We would love to hear from you if you:

  • Have a minimum 15 years of experience in cost management especially pre cons works, ideally from a consultancy background, on large scale construction projects ideally in data center, oil and gas, or life sciences projects.
  • A minimum of 4 years of past work experience required on Cost X (or Planswift / Cubicost /Candy / ZW CAD).
  • Have experience and confidence to lead a business, build a team and develop trusted client relationships.
  • Have a degree or comparable experience in a cost management or construction discipline.
  • Are currently living or looking to move to Farciennes (you must have the legal right to work already).
  • Are chartered or are on the path to complete it. We can help.
  • Are savvy in understanding the business model and pursuing market opportunities.
  • Are an excellent communicator verbally and in writing.
  • Love a dynamic environment with the opportunity to manage your own priorities and deadlines.
  • Thrive on building strong relationships with your team and clients through a shared purpose and sense of openness and fun.

All interviews are conducted either in person or virtually with video required.

About us

Since 1974, we’ve been providing a construction consultancy service that keeps clients coming back. And for that we have our people to thank. It takes a special kind of togetherness to create our thriving, authentic culture. We overcome challenges together, delivering better projects and leveraging innovation. We see the potential in our people and we empower them. We’re a business on a journey – an agile business that is proud to be different. We are Linesight. Dynamic. Driven. Different.

Our approach to DE&I

At Linesight, we believe that our success is tied to the success of our employees, and we are committed to creating a workplace that is fair, equitable, and inclusive for everyone. We understand that creating an environment where all employees have an equal opportunity to thrive requires a concerted effort across every stage of their time with us, from hiring and onboarding to promotion, career growth, and development.

As part of this commitment, we have implemented a range of policies and initiatives to promote diversity, equity, and inclusion (DE&I). This starts with our attraction pipeline and accessible job descriptions, designed to attract a broad range of candidates, and continuing throughout the employee life cycle with DE&I checks built in at every stage. Fairness, consistency, and transparency are the core principles for all our hiring, salary increase, and promotion decisions with built-in gender pay gap checks. Employee and family-friendly policies also enhance inclusion and equity in our teams.  

About Cost Management

Our teams of cost managers deliver cost predictability, a high level of assurance and value for money on prestigious, cutting-edge projects around the globe for world-leading clients. Be a part of our collaborative, close-knit teams, who share comprehensive knowledge of international, regional and local construction costs and benchmarks. We champion both mentoring and reverse mentoring across all levels and roles, so you can benefit from the deep expertise and development supports within our organisation, regardless of your experience or seniority.

Life at Linesight

Cost Manager video still

Join our Talent Network