Primark is a brand well-known throughout Ireland, the UK, and Europe and its inception into the USA has been much-anticipated. The Danbury branch was selected as the standard store prototype for Primark’s USA rollout. Linesight had been working with Primark throughout Europe for many years, and our client appointed our team to oversee this important project, which would headline its expansion into the US market.

An established partnership to pioneer Primark in the USA 

Linesight played a vital role in the value engineering of the conceptual design, not only for this specific project, but for the standard store roll out. It is a 70,000 sq.ft. standard store, which took 20 weeks to build out. This involved the installation of new floor, wall, and ceiling finishes, a complete new MEP installation, new elevators, and mill work. In addition, there was extensive storefront redevelopment and roof works carried out to complete the project. Linesight’s extensive expertise in the retail sector, allowed for works to be carried out on time and within budget, with strategic advice provided throughout. 

Proposing Primark prototypes 

  • The team developed a model for Primark which could be used on all future USA stores, covering everything from the selection of local materials to strategic procurement advice
  • Based on factors such as prominence and a desired level of capital investment, three grades of prototypes regarding level of finish and operation were developed. This means there is a model for future locations, one that is flexible to adapt to the location in question 

Key outcomes 

  • We worked closely with the project team and our client to significantly reduce costs on the project, by implementing comprehensive value engineering during the pre-construction/construction stages
  • Our team successfully maintained a high level of client satisfaction on the design outcome, while still delivering the project on time and under budget

Data

70,000sq.ft.

Size

US$11m

Cost

20 weeks

Build time

Patrick Ryan

Patrick Ryan

Executive Vice President – Americas

Americas

Latest Insights

27th September 2024

Transforming clean energy and manufacturing in the US: The role of the Inflation Reduction Act

If you are interested in discussing this report in more detail or would like to hear more from our team of experts, we invite you to connect with Morag Murray, Director, and Adrian Sanchez, Director, who will be in attendance at the upcoming Battery Show 2024 North America.

Continue Reading